Unit Specifics

On Line Date October, 1996
Combustion Turbine GE Frame 7EA, 84 MW each
Steam Generator Two Heat Recovery Steam Generators and One 80 MW Steam turbine
Fuel Natural Gas, No.2 distillate as backup
Fuel Handling 6.5 mile 10" Gas pipeline to Columbia LNG line (owned and operated by Wash Gas Light)
Transmission 4.5 mile 230 KV to PEPCO 500 KV Burches Hill Substation

Environmental Aspects

  • Cooling Water Source -- utilization of treated effluent from Mattawoman Waste Water Treatment plant in Charles County. Supplied by 17 mile pipeline. Five unit mechanical draft cooling towers. All effluent returned to Mattawoman WWTP.
  • Air Emissions -- Low dry NOx combustor design for gas firing, water injection for backup oil. NOx concentrations of 9 and 54 ppmvd for gas and oil backup respectively.
  • Backup fuel use -- fuel oil usage limited to 1200 hr/yr.
  • Summary Document -- Environmental Review of the Panda Brandywine Cogeneration Project -- PPSE PB-1, February 1997.
 